It has been two several years considering that we concluded changing our garage into a bed room and toilet. I keep in mind when we bought the dwelling and one of the initial items Craig said was that we really should switch the garage into residing area. I sort of brushed him off for the reason that it appeared like a seriously huge career and we had so quite a few other jobs to deal with. Lesson figured out, never doubt Craig when he sets his brain to one thing. When I found out I was expecting and our two bed room dwelling was heading to really feel fairly cramped, I opened up to the thought of changing the garage, which we only employed for storage in any case. As quickly as I was on board, he acquired to work. What began as a drawing on the again of a napkin turned into a wonderful house that we built from the floor up. Today I’m heading to share the aspects of converting our garage into a bedroom and lavatory with right before and afters of the renovation course of action.
How We Converted Our Garage Into A Bed room And Lavatory
The system of changing our garage into a bed room and bathroom was a massive undertaking and Craig was very methodical which genuinely helped in the prolonged run, primarily as we labored with contractors for the electrical wiring and plumbing. The total undertaking took 9 months from start off to end, getting into consideration he begun when I was pregnant and Incredibly sick, and finished when we experienced a newborn, and Covid had just strike. It most likely could have been done quicker if not for those points.
prepping the garage
The very first phase was prepping the garage to turn out to be an indoor living room. We procured a lose to put in our backyard which we now use for storage. A lot of people requested how we bought rid of our garage, but the real truth is we do not have that significantly stuff. What ever was in the garage we have been equipped to set in the lose or our basement. Here’s the course of action for prepping the garage:
- Vacant garage
- Seal all cracks and insulate basis with spray and rigid foam
- Remove garage door and build wall to enclose space (remaining header of garage doorway- we have no home windows on this wall)
- Get rid of window on facet and additional 3 casement windows (the home windows at the rear of our mattress)
- Exchange shingles on outside and shingle new front exterior
Construct subfloor
The next move was developing the subfloor which was essential for the reason that it was the foundation for everything else. We established that the flooring was structurally sound to establish the subfloor on top of it. Craig developed a subfloor with 2x10s and a major beam down the heart with anchor bolts screwed to the ground on the knee wall (as to local making code). The target was to match the new flooring height with the existing flooring in the household. Craig employed a laser degree, snapped a line and measured down, subtracting the thickness of the plywood and the flooring we prepared to use. He was able to flawlessly match the stage of the new and present flooring as you can see beneath. Right before installing the 3/4 inch tongue and groove plywood, Craig insulated the subfloor with fiberglass insulation. Craig also glued the plywood to the subfloor framing.
set up help beams
The garage ceiling didn’t have dry wall and we wanted a lofted ceiling so Craig taken off the present ceiling joists and collar ties and in their place put in guidance beams. He used a few 2x10s to develop 3 beams (he later on completed them to make the three 2x10s look like a single beam).
framing interior partitions and doors and pocket doorway
Craig experienced to build numerous interior walls and doorways to break up up the bed room and lavatory, make a hallway, and enclose the independent staircase to the basement.
- Framed wall and doorway for bathroom such as pocket doorway for toilet
- Framed wall involving staircase to basement and bedroom
- Framed door and wall to make entrance and hallway to bedroom from current house.
set up electrical wiring and rough plumbing
When the framing and subfloor were being in we scheduled the electrician and plumber. We spoke with them at the commencing of the project to figure out when would be the most effective time for them to arrive and do the rough in. The electricians arrived and put in the wiring for the ceiling lights and packing containers for retailers and switches so Craig would be ready to minimize around them when undertaking sheet rock. The plumbers set the tough plumbing in for the shower drain, self-importance sinks, and toilet plumbing which we linked via a hole in the wall below the subfloor from the garage to the basement. The electrician and plumber scheduled inspections for the tough-ins.
install sheetrock and insulate partitions and ceiling
We had a firm arrive to do spray foam insulation for the bedroom ceiling simply because it saved a ton of time and labor on our conclude. Craig set up drywall on all inside partitions insulated with fiberglass insulation. Then he taped all the seams and did a veneer coat with Venetian plaster which tends to make it a lot more tough and assists with odors. Then he sanded all the walls.
install ceiling
We definitely required to do a vaulted ceiling in the new room. At first we planned to use 1x10s but the lumber supplier didn’t have adequate for our job so Craig determined to alternate with 1×8 and 1×10 primed pine which he then painted with ceiling paint. Craig also mounted a skylight in the rest room ahead of he did the ceiling.
toilet put in
In the toilet, Craig begun with the shower. It was just one of the a lot more hard elements of the job so it took a little bit lengthier. The room for the shower in the toilet was a bit large for the foundation we ordered so he created the partitions to in shape the shower pan (you can see below they are slightly bumped out). He applied cement board for the within of the shower and then did a layer of stucco adopted by a waterproofing paint for showers. He then applied a number of levels of Venetian plaster and a sealant over the end coat.
toilet ground tile
In the toilet, Craig installed a layer of cement board about the plywood prior to tiling. However I cannot come across any of the tile set up pictures or videos but I’m hoping I can observe them down to present that system. We picked a hand painted Fireclay Tile and utilised a white grout.
priming and portray
Craig primed and painted the ceiling before he mounted the wooden floors. We then painted and primed all the partitions, trim and doorways.
Install wood flooring and trim
Soon after portray Craig installed the flooring. We employed Sawyer Mason in Oak Bluffs. It’s a phenomenal products that we’ve used once again in Vermont. The flooring comes pre-concluded and there are many installation alternatives you can read through about right here. Following setting up the flooring Craig set up the baseboard (1×6) and window trim with a 1×4 primed pine.
set up self-importance, bathroom, fixtures and shower door
Craig mounted the self-importance (came with the countertop), sinks, bathroom, fixtures and shower doorway after tiling and painting were being complete. The self-importance was surely a two human being career but it was at the beginning of Covid and Craig made the decision to do it himself. By some means he managed but it was difficult and not one thing I’d recommend. Craig did the self-importance plumbing himself and we experienced the plumber do the shower and rest room put in. The electricians also came again at the end to install the retailers and lights.
set up ikea pax wardrobes
Instaling the IKEA wardrobes was the last move before we moved all of our household furniture in. We calculated the house and figured out the optimum amount of money we could have, then Craig installed trim pieces on the close to make it look a small a lot more tailor made. You can see the whole approach for the IKEA wardrobes below.
closing views on the venture
The conversion of the garage to a bed room and lavatory was the greatest task we have taken on to date. It was the very first challenge exactly where we were generating our personal space from the floor up and experienced to system, coordinate, execute and understand how to do a good deal of points we experienced not completed ahead of. I completely Like this addition, and repeatedly seem around in amazement that Craig created this full factor himself. It was a large amount of function but has not only established a bedroom and toilet I enjoy, but added considerable value to our house though preserving fees way down by doing almost all of the labor on our possess. Obtaining long gone as a result of this task taught us a large amount and has persuaded us we can tackle a equivalent 1 down the highway in our Woodstock household which has a very comparable structure which include a garage we hope to change to residing area. I’m enthusiastic to see what we can do to completely transform that place and switch it into one thing we love just as much as this residence.
Disclosure: if you buy something as a result of my hyperlinks, I might earn an affiliate commission. Thank you for your aid of this web site.